We have successfully implemented numerous projects for our clients. Our references should inform and illustrate what we can do.

Industry
Sector
Integrated Spec. Planning
Client Location Project    
Heinzel Paper Laakirchen (AUT) Rebuild of PM10 to produce corrugated base paper
Heinzel Paper Raubling (GER) Determination of fair value – structural assessment
SCA Graphic Laakirchen (AUT) New construction of PM11 hall
Expansion of recycling paper store
Voith Renkum (NED) Rebuild for the production of brown paper
Cartiere Burgo Verzuolo (ITA) Construction of PM9
Model Group Eilenburg (GER) Conversion and adaptation for switching production from newsprint to corrugated base paper
Papierfabrik Palm Aalen (GER) Construction of PM5
Mondi SCP Ruzomberok (SVK) Construction of PM19
Knauf Petroboard (former KPK) Kommunar (RUS) Rebuild of BM2: wet end
Hamburger Rieger GmbH Spremberg (GER) New construction of PM2
Hans Kolb Wellpappe Memmingen (GER) New construction of digital printing plant
Leipa Georg Leinfelder Schwedt (GER) Rebuild of PM 1
Rebuild of PM 3
Expansion of wastewater treatment plant
New construction of sizing equipment
Rebuild of PM 5
Schoellershammer Dueren (GER) New construction of PM6
Wastewater treatment plant
MM Sons Group Cairo (EGY) Construction of Board Machine for New FinePac
Smurfit Kappa Nettingsdorfer Nettingsdorf (AUT) New construction of sprinkler control room
Hamburger Containerboard Dunaújváros (HUN) New construction of PM7 incl. stock preparation, paper reel store, workshop
Mondi Steti Steti (CZE) New construction of PM7
Rebuild of PM6
Rebuild of PM5 press section
Log storage area
Mayr-Melnhof Frohnleiten (AUT) Rebuild of BM2: Wet end and press section
Reconstruction of wastewater treatment plant
New construction of finished goods warehouse, cross cutter hall
Rebuild of BM3: Wet end and press section, winder, pope reeler
Expansion of grinding shop and log storage area
Foodboard: Rebuild of board machine
Grid reinforcement
Expansion of laboratory
Mayr-Melnhof Gernsbach (GER) Reconstruction of stock preparation
Hall ventilation system, sprinkler system, sludge dewatering system
Mosburger Strasswalchen (AUT) New construction of production hall for corrugated cardboard
New construction of Expedit
Smurfit Kappa Nettingsdorf (AUT) Expansion of sprinkler system / spray deluge systems
FS Karton Neuss (GER) Rebuild of BM5
Cross cutter 8
Dunapack Spremberg (GER) New construction of PM1, corrugated cardboard processing, recycling paper storage area, stock preparation, workshop, reel store, corrugated cardboard store, office building
Hamburger Containerboard Pitten (AUT) Rebuild of PM3
New construction of warehouse
Rebuild of PM 4
Expansion of wastewater treatment plant
Hamburger Containerboard Trostberg (GER) Rebuild of BM 2 winder
Hans Kolb Wellpappe Kaufbeuren (GER) New construction of PM4
New construction of PM6
FS Karton Baiersbronn (GER) New construction of grinding shop
Rebuild of BM2
Palm Paper Woerth (GER) New construction of corrugated cardboard centre
SHP Group / Paloma Sladki Vrh (SVN) Conversion tissue mill
Vajda Papir Dunaföldvár (HU) New construction PM2
Metsä Group Mariestad (SWE) New tissue mill
Intertrade Hellas Oinofyta (GR) New tissue mill
Wepa Bridgend, Wales (UK) Construction of new tissue plant
Essity Mainz-Kostheim (GER) Expansion of converting
Sofidel America Inola / Oklahoma (USA) New construction of tissue factory
Vajda Papir Dunaföldvár (HUN) New construction tissue plant
Arkhum Tissue Group Vorsino / Kaluga Region (RUS) New construction of tissue factory (raw materials warehouse, paper machine building, parent reel store, converting hall, finished goods warehouse, shipping area, office area, other ancillary buildings, outdoor facilities)
Sofidel America Circleville / Ohio (USA) New construction of tissue factory (raw materials store, paper machine building, parent reel store, converting hall, finished goods warehouse, shipping area, office area, other ancillary buildings, outdoor facilities)
WEPA Professional Piechowice Piechowice (POL) New construction of tissue machine building, reel store
Sofidel - Swedish Tissue Kisa (SWE) Expansion of plant premises incl. relocation of river, new construction of parent reel store, converting hall, office area, finished goods warehouse, shipping area, outdoor facilities
Sofidel s.p.a. Roanne (FRA) New construction of storage and shipping area
Universal Paper and Plastics Ga-Rankuwa / Pretoria (RSA) New construction of tissue machine building
Fripa Miltenberg (GER) New construction of PM6
New construction of PM7
Essity (former SCA Hygiene Products) Mainz-Kostheim (GER) New construction of PM 5
Ancillary buildings (stock preparation, reel store)
Essity (former SCA Hygiene Products) Mannheim (GER) New construction of building for WM 6 tissue machine
Industrie Cartarie Tronchetti Montargis (FRA) New construction of tissue factory (raw materials warehouse, paper machine building, parent reel store, converting hall, finished goods warehouse, shipping area, office area, other ancillary buildings, outdoor facilities)
Essity (former SCA Hygiene Products) Sovetsk / Tula Region (RUS) Expansion of tissue factory (raw materials store, PM2 paper machine building, parent reel store, converting hall, finished goods warehouse, shipping area, office area, several ancillary buildings, outdoor facilities)
Wepa (former Kartogroup) Leuna (GER) Construction of PM1
Sofidel Delipapier Stendal (GER) New construction of tissue factory (raw materials store, paper machine building, parent reel store, converting hall, finished goods warehouse, shipping area, office area, other ancillary buildings, outdoor facilities)
Procter + Gamble Manchester (GBR) New construction of tissue PM (BOUNTY)
Palm Paper King’s Lynn (UK) Construction of paper sorting plant
Delfort Olšany (CZ) New construction of PM6
Aarepapier Niedergoesgen (SUI) Rebuild of PM3
PM3 winder
Reel store
Perlen Papier Perlen (SUI) New construction of PM7 (newsprint) incl. recycling paper processing system, deinking system, reel store
Palm Paper King’s Lynn (GBR) New construction of PM7 (newsprint) incl. recycling paper processing system, deinking system, reel store and pertinent infrastructure
Heinzel Group Bruck an der Mur (AUT) Technical due diligence
Delfort (Feurstein) Traun (AUT) New construction of PM3 and finished goods warehouse II
Mondi Group Merebank (RSA) Rebuild of PM31
Mondi Group Ulmerfeld-Hausmening (AUT) Reconstruction of shipping centre
New construction of pulp storage area
Rebuild of equipment and reel store
Rebuild of PM5
Rebuild of PM6
New construction of wastewater treatment plant
Mondi Group Kematen (AUT) Rebuild of PM4
UPM-Kymmene Augsburg (GER) New construction of PM3
UPM-Kymmene Schongau (GER) New construction / rebuild of PM9
Rebuild of PM6
UPM-Kymmene Walsum (GER) New construction of peroxide bleaching system
New construction of winder
UPM-Kymmene Steyrermuehl (AUT) New construction of deinking system (DIP 2000): recycling paper processing
Rebuild of PM3: press section, calender section
Rebuild of TMP plant
Brigl & Bergmeister Niklasdorf (AUT) Rebuild of PM3
Papierfabrik Hermes Duesseldorf (GER) New construction of PM5
Rebuild of PM1
Mondi Syktyvkar (RUS) Expansion of pulp mill
Moritz J. Weig Mayen (GER) New construction / expansion of deinking system
Schönfelder Papierfabrik Annaberg-Buchholz (GER) New construction of deinking system
Zellstoffwerk Pöls Poels (AUT) New construction of liquor recovery boiler
ZS Zellstoff Stendal Stendal (GER) New construction of pulp mill (water treatment plant, boiler house, log storage area, fibre line, bleaching system, pulp dryer, pulp storage area, chemical storage, evaporation unit, causticizing unit
11er Frastanz (AUT) New construction of deep-freeze warehouse 4
Goodmills Group Krefeld (GER) Railway tracks and loading facility
AGRANA Pischelsdorf (AUT) Construction of wheat starch plant II
Vorarlberg Milch Feldkirch (AUT) Expansion of cheese production, packaging and logistics
New construction of high bay warehouse
ENERTEC Miratorg (RUS) New construction of abattoir
Suedzucker Zeitz (GER) New construction of wheat starch factory incl. production of gluten
Connection of plant to superior road network
CropEnergies Bioethanol Zeitz (GER) New construction of warehouse for neutral alcohol incl. ancillary facilities
Industrial sewage system
AGRANA Pischelsdorf (AUT) New construction of starch factory
Expansion of industrial sewage system
AGRANA Tulln (AUT) Reconstruction of molasses production
Rupp Privatkäserei Hörbranz (AUT) Construction of cheese dairy
RAUCH Trading Widnau (SUI) New construction of filling plant
LIDL Wundschuh (AUT) Logistics centre
LIDL Muellendorf (AUT) Logistics centre
LIDL Lindach (AUT) Logistics centre
Nestlé Austria Linz (AUT) Rebuild of storage and production building
Hirschmann Automotive San Miguel de Allende (MEX) New construction of production site
Hirschmann Automotive Kenitra (MAR) Expansion of production site
Hirschmann Automotive Rankweil (AUT) New construction of tool shop & staff centre
Magna Markt Schwaben (GER) New construction of production hall
ZF Friedrichshafen Friedrichshafen (GER) Head office
Support / project management
LOC Holz Arbing (AUT) New cross laminated timber plant
Göweil Maschinenbau Rainbach (AUT) New plant
Meyer Logistik Vorchdorf (AUT) New logistics center
Frischeis Asten/St. Florian (AUT) New plant
Säge Handlos Rainbach (AUT) New plant
Offsetdruckerei Schwarzach Schwarzach (AUT) Expansion High-bay warehouse
EHG Stahl und Metall Dornbirn (AUT) High-bay warehouse and sawing center
SWG Schraubenwerk Gaisbach Waldenburg (GER) Construction of production facility with wood
FunderMax Neudörfl (AUT) Construction of waste wood treatment plant
Rohrdorfer Gruppe Gmunden (AUT) Expansion of cement plant Hatschek
Lactosan Kapfenberg (AUT) Development stage A6
Lafarge Zementwerke Mannersdorf (AUT) Belt conveyor gallery
AHT Cooling Systems Rottenmann (AUT) Access to office building
New construction of warehouse
Böhler Edelstahl Kapfenberg (AUT) Bright steel production hall
Pro Finish
Relocation of road to laboratory
Borealis Linz (AUT) Refurbishment of sewerage system for cooling water
Staff parking area with approx. 430 parking lots
BP Gelsenkirchen Gelsenkirchen (GER) Wastewater treatment plant for the production of mineral oil
FMW Cheljabinsk (RUS) New construction of cement plant
Lenzing Lenzing (AUT) New construction of building for the production of tencel fibre with pulp storage
New construction of research building
New construction of technical wastewater plant
Linz AG Linz (AUT) New construction of the Linz Data Center 2
DONAUCHEM Pischelsdorf (AUT) New construction of solvent storage facility
Speedline Aluminium Schlins (AUT) Hall ventilation system / heat recovery system / exhaust gas cleaning system
Cement Plant Hatschek Gmunden (AUT) Expansion of cement plant
Mountain road (600 m) to access the plant's quarry in Gmunden
Tomaselli Gabriel Bau Ludesch (AUT) Installation of a photovoltaic system on the roof of the 5 storage halls of the logistics centre
Loacker Recycling Götzis (AUT) New construction of administration building, workshop
ENGEL Schwertberg (AUT) New construction of technology centre
ENGEL Kaplice (CZE) New construction of production site
KAESER KOMPRESSOREN Linz (AUT) New construction of assembly hall and office building
Trench Austria Leonding (AUT) Extension of test bay
Umdasch Group Amstetten (AUT) New construction of production halls, painting plant, 20 kV power supply
Vermietergemeinschaft Rauch Rankweil (AUT) New construction of the VINOMNA shopping centre
Bachmann electronic Feldkirch (AUT) Expansion of office building with training and conference centre
Transportation
Sector
Integrated Spec. Planning
Client Location Project    
GKB - Graz Köflacher Bahn und Busbetrieb Deutschlandsberg (AUT) Modernisation of train station
GKB - Graz Köflacher Bahn und Busbetrieb Frauental-Bad Gams (AUT) Modernisation of train station
OEBB Mittlern (AUT) 50 Hz site management
section Mittlern - Althofen/Drau (19 km)
ÖBB Infrastruktur Allerheiligen (AUT) Modernisation of train station
Magistrate of the city of Linz Linz (AUT) New bridge over the Danube, lighting
ÖBB Infrastruktur Losenstein (AUT) Reconstruction of railway station (building engineering and bike & ride facilities)
ÖBB Infrastruktur Wolfurt (AUT) Wolfurt Terminal, coordination of construction works in accordance with the Austrian BauKG act (joint venture)
ÖBB Infrastruktur Lustenau (AUT) Lustenau station, site supervision (joint venture)
ÖBB Infrastruktur St. Poelten (AUT) Westbahn tunnel chain, firefighting water system, emergency exits
Linz AG / NSL Linz (AUT) Demolition of railway bridge in Linz, coordination of construction works in accordance with the Austrian BauKG act and site supervision
GKB - Graz Köflacher Eisenbahn und Busbetrieb Premstaetten (AUT) Premstaetten station: island platform and pedestrian tunnel, track renewals
GKB - Graz Köflacher Eisenbahn und Busbetrieb Soeding - Mooskirchen (AUT) Side platform, pedestrian tunnel, track renewals
GKB - Graz Köflacher Eisenbahn und Busbetrieb Krottendorf (AUT) Side platform, pedestrian tunnel, track renewals
GKB - Graz Köflacher Eisenbahn und Busbetrieb Graz (AUT) Graz-Koeflacher station: island platform and underpass
GKB - Graz Köflacher Eisenbahn und Busbetrieb Strassgang (AUT) Substructure improvement, Strassgang – Premstaetten
GKB - Graz Köflacher Eisenbahn und Busbetrieb Frauental - Deutschlandsberg (AUT) Substructure improvement
GKB - Graz Köflacher Eisenbahn und Busbetrieb Lieboch - Soeding (AUT) Substructure improvement, single cross-over
ÖBB Infrastruktur Graz (AUT) Styrian Ostbahn railway line, upgrade to twin track of the Messendorf – Don Bosco section
Graz main station, passenger car sidings and loading platform
Construction measures for traffic junction at Graz main station
Office building
Koralmbahn railway line, Graz main station - Graz Puntigam section
Side platform, Graz Liebenau-Murpark stop
ÖBB Infrastruktur Ehrenhausen (AUT) Side platform
ÖBB Infrastruktur Steyregg (AUT) Installation of electronic interlocking system
ÖBB Infrastruktur Piberbach (AUT) Reconstruction of railway stations (building engineering), Kematen/Krems; Rohr/Bad Hall; Neuhofen/Krems;
ÖBB Infrastruktur Upper Austria (AUT) Refurbishment of Oberland station
Refurbishment of platforms in Gunskirchen, Obertrattnach
Upgrade of culvert along the Weyer–Kleinreifling route
Drainage works at Kalvarienberg, Lambach
Rehabilitation of masonry, Ennstal route
Geotechnical accompanying measures for track renewals in Noestlbach, Marchtrenk and Haidng
ÖBB Infrastruktur Styria (AUT) New construction of crossing bridge and underpass in Michaelerberg
Upgrade of culvert along Eisenerz-Hieflau route
Drainage works at Eisenerz-Tullbach station
Rockfall protection mesh along the Hieflau route, Landl and Schwaigerwald/Altenmarkt stations
Container Terminal Enns Enns (AUT) - New construction of expansion module with 2 portal cranes and paved area for 8,000 containers
- Second expansion phase: container storage area of 38,000 m², loading track, loading road, empty container storage area
Wopfinger Transbeton Schoenau / Triesting (AUT) Rail link to Flexidorf and Schoenau
Mayr-Melnhof Karton Frohnleiten (AUT) Supply of track installations: extension of the existing rail link by 0.5 km and 3 turnouts
Franz Oberndorfer Woellersdorf (AUT) Rail link incl. accompanying path and level crossing
Knauf Weissenbach / Liezen (AUT) Extension of rail link, eastern and western sections
Stern & Hafferl Gmunden (AUT) Gmunden-Vorchdorf StadtRegio tram
Holding Graz Lines Graz (AUT) Track and switch repair works at Hauptplatz and Herrengasse
Network extension, route selection for South-West line (Gleistrasse)
Track repair works at Dietrichsteinplatz
Extension of tram line 4
Track repair works at Georgigasse
Track repair works at Reitschulgasse
Track repair works at Theodor-Koerner-Strasse
Linz AG Linz (AUT) Harter Plateau tram line: 5 km, partly underground, 8 stops, Leonding remise (joint venture)
Schiene OÖ Traun (AUT) Traun StadtRegio tram: 5 km tram line, 8 stops (joint venture)
Gemeinde Langen b. Bregenz Langen b. Bregenz (AUT) New roundabout
Land Steiermark Liezen/Ennstal (AUT) Rebuild of Trautenfels traffic junction,
bridge and roundabout
Local Community of Hard Hard (AUT) New bridge over the Birkengraben
ASFINAG Hohenems (AUT) New construction of a control room to control road tunnels in Vorarlberg
OÖ Landesregierung Klaus - St. Pankraz (AUT) Styrtal cycle track, approx. 5.4 km incl. underpass structures
OÖ Landesregierung Loidersdorf (AUT) Widening of road and modification of alignment of L 1016 Laubenbach road
OÖ Landesregierung St. Ulrich (AUT) Werkstrasse-Kiernbergstrasse roundabout at B 115 Eissenstrasse
Siemens AG Georgien (GEO) Mountain road (approx. 1.8 km) with heavy goods traffic to access substation
Stadtgemeinde Attnang-Puchheim Attnang-Puchheim (AUT) Stairways in Puchheimer Au
Stadtgemeinde Liezen Liezen (AUT) Roundabout and bus station
Land Steiermark Altirdning (AUT) L 734 road reconstruction
Land Steiermark Haus / Ennstal (AUT) L 725 road reconstruction, Roessingstrasse junction
Reconstruction and adaptation works incl. new construction of pavement
Mayr Melnhof Frohnleiten (AUT) Expansion of passenger car parking area
New construction of lorry parking area
GKB - Graz Köflacher Eisenbahn und Busbetrieb Graz - Koeflach (AUT) Several park & ride and bike & ride facilities in the transport network of the GKB railway line
Stadt Graz Graz (AUT) Traffic calming in Augasse
Stadtgemeinde Gleisdorf Gleisdorf (AUT) “Haus des Kindes” traffic management concept
Schweizerische Bundesbahnen SBB Olten (SUI) - Expansion of workshop building
- New construction of workshop hall with 3x 150 m long tracks for the maintenance and commissioning of multiple unit and articulated trains
ÖBB Infrastruktur Attnang-Puchheim (AUT) Expansion of training workshop
Wiener Lokalbahnen Wien (AUT) New operations building
ÖBB Infrastruktur Knittelfeld (AUT) Training workshop
OEBB TS Bludenz (AUT) New construction of workshop hall for maintenance and commissioning of passenger trains
Length: 126 meters
ÖBB TS Vienna (AUT) Simmering plant
Jedlersdorf city jet
Siemens Wegberg-Wildenrath (GER) New construction of ZBH 3 multi-purpose hall
New construction of ZBH 2 train composition hall
Reconstruction of ZBH 2 traction power supply system
Expansion of ZBH 2 bogie drop pit
DEGES Hamburg (GER) Tunnel control centre (joint venture)
Schweizerische Bundesbahnen SBB Zurich Altstetten (SUI) Major overhaul of listed objects and conversion
ZAS heating station
ÖBB TS Linz (AUT) Reconstruction of repair facility incl. social and sanitary wing
New construction of final production hall
Rehabilitation and expansion of washhouse
ÖBB TS Graz (AUT) Site concentration II: New construction of quick-repair facility
ÖBB TS Knittelfeld (AUT) New construction of painting hall
ÖBB Produktion Graz (AUT) Traction, site optimisation of Graz main station
ÖBB Infrastruktur Graz (AUT) Train washing facility at Graz station
ÖBB Produktion Villach (AUT) Site concentration, social and administration building
Westbahn Linz (AUT) New construction of railway repair hall
GKB - Graz Köflacher Eisenbahn und Busbetrieb Graz (AUT) Service building for Graz-Koeflach railway station
ÖBB Immo Graz (AUT) Office building
Power Plants
Sector
Integrated Spec. Planning
Client Location Project    
Elektrizitätswerke Reutte Reutte (AUT) Modernization of the power plant:
- Fish lift lock
- Renewal of the hydraulic steel structure, overhaul of turbine and generator, renewal of the entire electrical system
- Construction of third weir field
Laakirchen Papier AG Laakirchen (AUT) Danzermuehl power plant, replacement: power house (9.2 MW / 9.2 m), weir structure with 2 fields, river engineering, fish ladder
WELS STROM Traunleiten (AUT) Traunleiten power plant: power house (17.4 MW, 13.6 m), extension of waterway (status: EIA authority approval received)
Ennskraftwerke Staning (AUT) Staning power plant, renovation of crane rail
Ennskraftwerke Enns (AUT) Enns power plant: small hydropower plant, turbine type “flexible power plant”
(1.0 MW, 5.1 m head) reconstruction of weir
Ennskraftwerke Thurnsdorf (AUT) Small hydropower plant (2.0 MW, 10.5 m), fish ladder (vertical slot and near-natural channel) with a total length of 1.2 km
Ennskraftwerke Pichlern (AUT) Pichlern power plant at the Steyer river, power house (2.4 MW, 5.7 m), revamp of side weir, river engineering, fish ladder
Vorarlberger Illwerke Gaschurn (AUT) New construction of Obervermuntwerk II power plant – building services
Vorarlberger Illwerke Vandans (AUT) Rellswerk pumped storage plant: power house, shaft construction method for pump turbine (14 MW, 530 m), tender design, construction design, structural engineering, site supervision
Frohnleiten Energie- und Liegenschaftsverwaltung Rothleiten (AUT) Rothleiten power plant: Mur power plant, power house (9.8 MW, 5.8 m) weir structure with 3 Tainter gates, river engineering, fish ladder
Niklasdorf Energie- und Liegenschaftsverwaltung Niklasdorf (AUT) Niklasdorf power plant: Mur power plant (2.4 MW, 4.5 m) weir structure with 2 weir flaps, residual water machine, river engineering
EW Reutte Heiterwang (AUT) Reconstruction of Rotlech weir: installation of second bottom outlet gate at the existing weir, 27 m water pressure

Heiterwand pumped storage plant: extension of pumping system to the existing storage power plant: 3 RPM-regulated rotary pumps (3 x 1.0 MW, 101 m)
Stadtwerke Feldkirch Feldkirch (AUT) Illspitz power plant: new construction of run-of-river plant (8.0 MW, 8.0 m), weir structure with 3 Tainter gates, river engineering
Salzburg AG Hintermuhr (AUT) Hintermuhr pumped storage plant: cavern power house for pumping turbine (67 MW, 600 m), enlargement of reservoirs, penstock, surge chamber
Stadtwerke Wörgl Woergl (AUT) Kelchsau-Ehreit power plant: deviation power plant, water intake structure and pressure pipe (length: 3.4 km), power house (1.7 MW, 97.5 m)
MACHLAND DAMM GmbH Saxen (AUT) Marchfeld flood control structure at the Danube river, construction lot 4, Saxen: Construction of earthfill dams (2.1 km), flood protection walls (1.1 km), 13 pumping station, 5 emergency power stations
Permit application design (EIS and EIA), tender design, construction design
EW St. Anton St. Anton / Arlberg (AUT) Kartell power plant: storage power plant, earthfill dam h=80 m, penstock and pressure shaft,
2x 4.3 MW, 535 m head
KW Hofmühle Ulmerfeld-Hausmening (AUT) Hofmuehle power plant: Ybbs power plant, weir structure with 2 flaps, bottom outlet, power house (2.8 MW, 7.7 m), vertical slot, river engineering
Salzburg AG Hallein (AUT) Gamp power plant: Salzach power plant (2x 4.3 MW, 6.6 m)
(joint venture)
E-Werksgemeinschaft Sagschneider, Salzinger, Zeiler und Partner Oeblarn (AUT) Strieglerbach power plant: deviation power plant, weir with desander, pressure pipe DN 1,000 m, power house with Deriaz turbine (920 KW, 170 m), fish ladder
Progroup Sandersdorf-Brehna (GER) Waste to Energy plant
UPM Nordland Papier Dörpen (GER) New combined cycle power plant
Norske Skog Bruck an der Mur (AUT) Energy plant with waste incineration boiler
Salzburg AG Siezenheim (AUT) New biomass cogeneration plant Siezenheim II
Papierfabrik Palm Wörth (GER) Waste incineration plant
sludge2energy GmbH Halle-Lochau (GER) New sludge incineration plant
Palm Paper King’s Lynn (GB) CCGT plant
Smurfit Kappa Nettingsdorf (AUT) Future Energy Plant
AVN Duernrohr (AUT) 3rd feeding conveyor for energy from waste plant
Modification of existing waste bunker
New construction of pre-hopper, boiler house, power station, flue gas treatment, chimney, administration building
Hitachi Zosen Inova Zurich (SUI) Thermal power plants fired with waste material: provision of consulting services relating to structural engineering, dynamics and building services for various projects in Great Britain
Hamburger Containerboard Dunaújváros (HUN) New construction of power plant fired with biomass (wood logs, wood chips, waste material from the paper-making process) for steam and electric power supply of paper mill
Linz AG Linz (AUT) New construction of thermal power plant fired with waste material, incl. waste material processing
Thermal capacity: 66 MWl
UPM Schongau (GER) New construction of thermal power plant 3 (combined cycle plant)
Smurfit Kappa Zülpich Zuelpich (GER) New construction of power plant fired with coal/waste material (combined cycle plant)
Electrical power of turbine: 16 MW
Steam flow rate: 100 t/h of live steam (500 °C and 120 bar)
Bioenergie Steyr Ramingdorf (AUT) New construction of biomass-fired thermal power plant with biomass storage facility
EVN Umwelt Moscow (RUS) New construction of MPZ 1 waste incineration plant
New construction of MSZ 3 waste incineration plant
Thermal capacity: 46 MW
EVN Umwelt Zwentendorf (AUT) New construction of Line 3 of the Duernrohr thermal waste utilisation plant
EVN Istanbul (TUR) Preliminary design for waste utilisation plant
EVN Zurich (SUI) Preliminary design for waste utilisation plant
EVN Kabd / Kuwait City (KWT) Preliminary design for waste utilisation plant
EVN Wärme Guntramsdorf (AUT) New construction of biomass-fired thermal power plant
Public Sector
Sector
Integrated Spec. Planning
Client Location Project    
Gemeinde Gaschurn Gaschurn (AUT) New construction of maintenance yard, local recycling yard
Marktgemeinde Neufelden Neufelden (AUT) New construction of fire station and municipal maintenance yard
Pfarre Altenstadt Feldkirch-Altenstadt (AUT) New construction of parish centre
VLV Vorarlberger Landesversicherung Bregenz (AUT) New headquarters for state insurance
Swietelsky / SGKK Salzburg (AUT) Salzburger Gebietskrankenkasse (Regional Public Health Insurance)
Office tower
Krankenhaus Betriebsgesellschaft Feldkirch (AUT) New construction of operations area
Rehabilitation / reconstruction of existing structures
Central kitchen
Krankenhaus Betriebsgesellschaft Bludenz (AUT) Major overhaul / reconstruction of kitchen / emergency room / radiology department
Rehabilitation of bed wing
Swietelsky / Spielvereinigung Greuther Fürth Fuerth (DE) Planning and design of outdoor facilities
Alpen-Erlebnisbad VAL BLU Bludenz (AUT) Rehabilitation of indoor swimming pool and outdoor area
Gemeinde Vandans Vandans (AUT) Rehabilitation of Montafon outdoor swimming pool with landscaped swimming area
Marktgemeinde Götzis Goetzis (AUT) Rehabilitation of Riebe outdoor swimming pool (pool, water treatment, social / changing area)
Stadt Feldkirch Feldkirch (AUT) New construction of the Montforthaus, electrical engineering
Bregenzer Festspiele Bregenz (AUT) Structural engineering works for the Seebuehne stage design of the Bregenz Festival:
- André Chénier (2011)
- Tosca (2007)
- Troubadur (2005)
- Westsidestory (2003)
- La Boheme (2001)
- Maskenball (1999)
- Porky and Bess (1997)
Abwasserverband Feldkirch Feldkirch (AUT) sewer modernisation
Water cooperative Batschuns Batschuns (AUT) Construction elevated tank
Abwasserverband Vorderland Koblach (AUT) Rehabilitation of wastewater treatment plant
Abwasserverband Feldkirch Meiningen (AUT) Sewerage system cadastre
Abwasserverband Rotachtal Langen (AUT) Sewerage system cadastre
Abwasserverband Bezau Bezau (AUT) Sewerage system cadastre
Stadt Dornbirn Dornbirn (AUT) Sewerage system, roads
Gemeinde Alberschwende Alberschwende (AUT) Sewerage system cadastre
Gemeinde Au Au (AUT) Sewerage system cadastre
Gemeinde Blons Blons (AUT) Elevated reservoir
Gemeinde Dalaas Dalaas (AUT) Sewerage system
Gemeinde Eichenberg Eichenberg (AUT) Drinking water, sewerage system cadastre
Gemeinde Hard Hard (AUT) Roads
Gemeinde Hohenweiler Hohenweiler (AUT) Elevated reservoir, drinking water
Sewerage system cadastre, creek diversion
Gemeinde Klösterle Kloesterle (AUT) Elevated reservoir, sewerage system/drinking water cadastre
Gemeinde Langen Langen (AUT) Roads
Gemeinde Lauterach Lauterach (AUT) Sewerage system cadastre, sewerage system, roads
Gemeinde Möggers Moeggers (AUT) Drinking water
Gemeinde Muntlix Muntlix (AUT) Drinking water, roads
Gemeinde Schwarzach Schwarzach (AUT) Sewerage system cadastre, general project, sewerage system, roads
Gemeinde Stuben Stuben (AUT) Sewerage system, drinking water
Gemeinde Zwischenwasser Zwischenwasser (AUT) Roads
Special Topics
Sector
Integrated Spec. Planning
Client Location Project    
Hilti Schaan (LIE) Reconstruction of assembly hall in office building
Thyssen Krupp Presta Eschen (LIE) Machine installation, presses
Böhler Edelstahl Kapfenberg (AUT) New construction of laboratory building
Böhler Edelstahl Deuchendorf (AUT) Site analysis (vibration)
Grass Hoechst (AUT) Vibration of punching machines
Heinzel Energy Laakirchen (AUT) Environmental impact statement, technical report for hydropower plant
Miba Frictec Roitham (AUT) Installation of machine tools
Miba Gleitlager Laakirchen (AUT) Machine foundation rolling mill
Voestalpine Linz (AUT) Vibration isolation of lab rooms
RAG Vienna (AUT) Machinery foundations of compressor
Sappi Kirkniemi (FIN) Rebuild of PM3 coater
Heinzel Paper Laakirchen (AUT) Analyses of PM10 and PM11
Mondi Hausmening (AUT) Analyses of paper machines
Mondi Ruzomberok (SLO) Analyses of paper machines
Mondi Steti (CZE) Analyses of paper machines
Mondi Syktyvkar (RUS) Analyses of paper machines
Airbus Bremen (GER) Simulation of cargo handling systems
Papierfabrik Palm Woerth (GER) Analysis of PM6 drives
Dow Chemical Europe Horgen (SUI) Acceptance measurement, pilot coating machine
Andritz Rollteck Holzmaden (GER) Analysis of reel cutter machines
DS Smith Walzenhausen (GER) Analysis of PM1
Sofidel America Circleville / Ohio (USA) New construction of tissue factory
Sofidel - Swedish Tissue Kisa (SWE) Processing and logistics
MM Sous Group Cairo (EGY) New construction of tissue factory
Sofidel s.p.a. Roanne (FRA) Warehouse, production, shipping area
Universal Paper and Plastics Pretoria (RSA) New construction PM
Sofidel Intertissue Wales (GBR) Plant expansion
JCL Logistics Dornbirn (AUT) New construction of logistics centre
Palm Paper King’s Lynn (GBR) Newsprint greenfield project
Roto-cart Castelfranco (ITA) Tissue greenfield project, production, store, processing, shipping area
SCA Hygiene Products Solvetsk (RUS) Plant expansion
Delfort Kuala Lumpur (MAS) Special paper greenfield project
Essity Spain Building Condition Assessment (BCA):
- Allo (inspected buildings: 45)
- Valls (24)
Essity USA Building Condition Assessment (BCA):
- Barton (inspected buildings: 19)
- Harrodsburg (8)
- Menasha (43)
- Middletown (11)
- Neenah (21)
Essity France Building Condition Assessment (BCA):
- Gien (inspected buildings: 47)
- Hondouville (120)
- Kunheim (26)
- Le Theil (12)
Progroup Building Condition Assessment (BCA):
Burg (inspected buildings: 6)
Weig Group Building Condition Assessment (BCA):
Mayen (inspected buildings: 14)
Wepa Italy Building Condition Assessment (BCA):
- Cassino (inspected buildings: 25)
- Lucca (10)
Wepa Germany Building Condition Assessment (BCA):
- Giershagen (inspected buildings: 15)
- Mainz (16)
- Müschede (12)
Essity UK Building Condition Assessment (BCA):
- Manchester (inspected buildings: 14)
- Oakenholt (18)
- Prodhoe (53)
- Skelmersdale (26)
- Stubbins (26)
Essity Germany Building Condition Assessment (BCA):
- Kostheim (inspected buildings: 64)
- Mannheim (40)
- Neuss (26)
- Witzenhausen (15)
Mayr-Melnhof Gernsbach (GER) Refurbishment of roof, BM2
SCA Hygiene Products Neuss (GER) Refurbishment of ceilings of PM 1 and PM 2 hall without interrupting production

Selected BHM projects

We support our clients at all their sites or locations, on regional, national or international level.